Construction of a single-circuit 110 kV OHTL from the existing 110/35/6 kV substation ‘Chinoz’ to the existing 220/110/10 kV substation ‘Feruz’ (L-F-Ch).

JSC “Uzkishloqelektrqurilish”

лэп столб